Add on features / Total Station Navigation / Total Station Navigation
Total Station Navigation
Optional method for precise navigation of the drill rig in a tunnel.

Total Station
Navigation is one of the most time-consuming and error prone activities in the tunnelling cycle. By automating this process that set-up of the drill rig can be done by the drill rig operator alone. The tunnelling cycle does not have to wait for the surveyor to come out and deploy the drill rig. With the Total Station Navigation the effectiveness of the tunneling cycle will improve, as will the quality of the navigation.
Features and benefits
- Navigation can be performed by the drill rig operator
- Navigation is confirmed on the operator’s display unit
- Navigation is fast, 1–5 minutes, compared to 30 minutes with manual methods
- Navigation has better accuracy than 1 cm
- Navigation is easily verified
- Surveyors must not be present at every navigation
- Drill, Profiler and MWD logs are navigated and reported in tunnel coordinates
Downloads
- Technical specification Total Station Navigation (484.123kB, Pdf document)