Το πρόγραμμα περιήγησης που χρησιμοποιείτε δεν υποστηρίζεται
Χρησιμοποιείτε ένα πρόγραμμα περιήγησης που δεν υποστηρίζεται πλέον. Για να συνεχίσετε να επισκέπτεστε τον ιστότοπό μας, επιλέξτε ένα από τα παρακάτω υποστηριζόμενα προγράμματα περιήγησης.
Compressors for pipe cleaning and all other services
While the pipeline construction and service industry mainly contacts us for oil free compressors for pipe cleaning and dewatering through pipeline pigging, we provide industrial rental materials for all pipeline services.
Atlas Copco Rental Pipelines services for the Midstream sector
For the Oil & Gas Midstream segment at Atlas Copco Rental, we have solutions to support all kinds of pipelines related jobs. With this video we will review the different solutions we can offer by following the value chain of the Midstream sector.
Our rental solutions include dryers, generators, matching accessories like manifolds and hoses and complete fuel services.
Cleaning and dewatering equipment: 100% oil free low and high pressure air compressor for all terrains and distances
Drying and dehydration equipment: 100% oil free air compressors with air-drying equipment for every low dewpoint
Electricity supply: diesel driven generators to keep your operations running
Complementary pipeline services and equipment
While our engineers design the matching set-up for your specific project, we complement our compressors and generators with these accessories to provide you with a total solution:
Dryers and dryer-compressor combinations: compact build, dewpoints of -40°C to -70°C, low energy consumption (you save money), very low pressure drops to improve energy efficiency
Manifolds
Hoses
Complete fuel services
Latest news & application stories
Introducing: modular 8 ton / h temporary specialty steam solution
Combining the latest steam technologies with the skill of specialists and their in-the-field experience, Atlas Copco Specialty Rental’s “Plug and steam” solutions have been designed for those steam projects where time, speed, and flexibility...
Flushing over 3,7 million cubic meters of air over a distance of 105 kilometers through a 36-inch diameter pipeline at 120barg in just a few days is a serious feat of engineering. Something, which can only be achieved thanks to meticulous preparation,...