In the Philippines, where construction projects often face heavy rainfall and high groundwater levels, effective dewatering is crucial. Northern Builders Philippines recently began a pipe-laying project in Toledo City, Cebu, requiring deep excavation of up to 5 meters in a runoff-prone area. To ensure smooth operations, their Field Service Engineering (FSE) team partnered with Atlas Copco Philippines for a reliable dewatering pump solution.
By using the Atlas Copco VAR 6-250 self-priming centrifugal pump, the team successfully managed groundwater control, keeping the site dry, stable, and safe. With strong performance, high efficiency, and low maintenance, the VAR 6-250 played a key role in completing the drainage pipe installation on time.
Dewatering Challenges in Construction Sites: A Reliable Pumping Solution
Construction dewatering is critical for site safety and efficiency—especially in areas prone to flooding or heavy runoff. In this project, dewatering was essential not only for excavation but also for managing the drainage systems surrounding the town proper.
The team relied on the VAR 6-250 dewatering pump to remove accumulated water quickly and maintain dry working conditions. Its durable construction, powerful performance, and fuel efficiency made it an ideal solution for deep excavation and continuous pumping tasks in the Philippines’ demanding construction environments.
Why the Atlas Copco VAR 6-250 is Ideal for Dewatering in the Philippines
The Atlas Copco VAR 6-250 is a self-priming centrifugal dewatering pump designed for high-demand applications. It delivers up to four times the pumping rate of standard submersible pumps, helping projects reduce downtime and improve productivity. It can also handle dirty water with a specific gravity of up to 1.1—perfect for construction and mining sites.
With its high flow rate, tough build, and low operating cost, the VAR 6-250 stands out as one of the best dewatering pumps in the Philippines for contractors seeking performance and reliability.
On-Site Support from Atlas Copco Philippines: More Than Just a Pump
The partnership between Northern Builders Philippines and Atlas Copco extended beyond equipment delivery. Atlas Copco’s technical team provided on-site commissioning and hands-on training, empowering the FSE team to operate the VAR 6-250 safely and efficiently under real job site conditions.
We saw the results right away. The dewatering process became faster and more manageable, and having the Atlas Copco team on-site to guide us through setup and operation made a huge difference. It's clear that the equipment is built to last and really fits our needs in the field.
Need a Dewatering Pump in the Philippines? Atlas Copco Has You Covered
Whether you're managing deep excavations, pipe-laying operations, or site drainage, the Atlas Copco VAR 6-250 is built to handle the challenge. Its powerful self-priming system, solids-handling capabilities, and durable design make it a trusted solution for construction dewatering across the Philippines.
Looking for a reliable dewatering pump in the Philippines? Contact Atlas Copco Philippines today to learn how the VAR 6-250 can support your next project.