Get a Complete Overview of Our Solutions

Explore our Compressed Air, Industrial Gas & Process Cooling Solutions. Discover our full range of Products and Sustainable Technologies.
Capability Brochure

Total Responsibility Plan - Complete Compressor Care

A Total Responsibility plan takes care of everything. All air compressor maintenance, upgrades, repairs and drive line overhauls are included for an all-inclusive price.
Air Compressor Service and Parts

Explore the Industries We Serve

We tailor our solutions to meet each industry's specific performance, quality, and sustainability needs. With a comprehensive product range and broad service network, we offer streamlined, dependable support across virtually every major industrial sector.
A young brewer in a leather apron controls the grinding of malt seeds in a mill at a modern brewery.
Close

Local cement factory can save 35 000 EUR/year with energy recovery

Service Audit and optimization

A leading manufacturer of eco-friendly cellulose fiber cement boards, wanted to improve the utility room while reducing boiler fuel and energy consumption. 

The Challenge

utility room

The utility room consists of four oil-injected compressors. Three Atlas Copco units and 1 competitor unit. Two of them have 7 400 running hours per year each, which has a significant impact on the customer’s carbon footprint.

To explore the possibility of reducing boiler fuel consumption through energy recovery, the customer contacted Atlas Copco.

The Solution

Atlas Copco proposed a turnkey solution for the two compressors with high running hours. The proposal consists of two energy recovery units (one for each compressor) / two flow meters / two energy counters and two SMARTLINK Licenses.

 

  • The Energy Recovery Units produce 58m³ hot water daily, heating it from 25°C (city water) to 85°C.
  • The flow meters, energy counters and SMARTLINK Licenses are used to measure, calculate and track the actual savings. 

     

Based on the SMARTLINK data of the first three days, we are able to estimate the annual savings.

The Outcome

The data indicates a reduction in energy consumption of 1 238 000 kWh/year, equal to EUR 35 000 (MYR 163 000)/year. In addition, we are able to achieve a reduction of 767 tons/year of CO2 emissions. 

 

This means that the payback period for the two Energy Recovery Units is less than 1 year.

The Savings

767tons/year

CO2 reduction

1238000kWh

Electrical savings/year

35000EUR

Cost savings/year