When steam is critical to your operations; downtime is not an option. In case of an emergency, we provide plug and steam solutions for swift deployment.
During a quarterly maintenance project, our long-time customer required a steady flow of N2 an occasional boost in that flow. To address this, we turn to the NGM 1000 Nitrogen Generator paired with the PBE 1600 VSD+ Booster.
Introducing: modular 8 ton / h temporary specialty steam solution
13. september 2021
Concept Lab: 8T per hour “Plug and steam” solution. The first steam boiler made with Atlas Copco Specialty Rental's expertise! The 8T unit combines the flexibility of smaller units with the output of large-scale operational steam demands. A truly agile solutions!
Pressure testing LNG installation with oil-free air in Belgium
30. april 2020
The brand-new LNG storage tank and boil-off gas compressors of the Fluxys LNG terminal in the port of Zeebrugge, in Belgium, required intensive testing prior to becoming operational to ensure the installation’s safety, reliability, and leak tightness.
Maximum performance with minimum downtime for Chinese chemicals plant
17. februar 2020
How do you purge and dry a 660,000 ton/year propane dehydrogenation unit and 400,000 ton/year polypropylene unit without electricity? And how do you do that fast?