5 Things you need to know before selecting your temporary power supply
Follow this check list to optimize your next project
When you require a temporary power supply, you will no doubt find many different possibilities: from a single generator, to power modules working as a power plant in all sizes and configurations. Each of these unique solutions has specific strengths.
The challenge is to select the solution that is the best match for your needs.
When you need back-up power for a production facility; the power flucuations will most likely be caused by either production shifts or the specific processes in your operations. These can vary greatly.
On the other hand, commisioning projects usually require high varations in power.
Diesel driven power modules are an efficient power source when running at full load. When your power demand is stable, select the power module that is the best fit for your maximum power requirement.
On the other hand, flucuations will cause a power module to run at partial load; greatly decreasing efficiency of the temporary power solution. When your power demand varies over time; make sure to check alternative set-ups, such as a hybrid power plant.
When your site is connected to the grid; you might only need power at specific times to balance a temporary power shortage or expected power downtime. Contact a specialist to optimize your available grid and a temporary independent power supply for the most efficient solution.
3. Safety requirements
Any power source can be potentially hazardous. When installing a temporary power supply, make sure your supplier is well equipped and trained to handle this in a proper way - so you can enjoy a safe supply of power. Look for ISO certification for official validation.
4. The working site
Consider the location where the temporary power plant needs to be installed.Â
What is the maximum footprint for the temporary installation? You supplier should be able to share a detailed plan. Keep in mind installation and decommissioning also require space. Â
Access on the site: your operation might be critically protected, requiring high security clearance to access the site. Some installations require regular maintenance intervals - meaning more frequent site visits are required. When access is an issue; ask your supplier for the most optimal solution.
Is the site easy to reach? Whether remote, in rought terrain or even offshore; make sure you select a supplier that can easy and quickly reach your operation.
Impact on site: make sure to specify any requirement whether it comes to noise, heat, ... or any other impact the temporary installation might have.
5. Local legislation
Stage V, T4F, zero emission zones, noise restrictions in urban areas... every site has to take into account the local legislations during the project preparation stage. CO2 emission might be the most obvious restriction; but there are many more eg:
Local electric standards on equipment and installations (cablings, earthing, etc,...)
Customer challenge: to safely move the 3000-ton panel of a submerged wave energy converter to shore for maintenance, in between tides and in potentially rough seas
With fossil free fuels becoming increasingly competitive, and electricity is created, today more than ever before, with renewable energy sources, the wave to electrification is getting higher and gaining momentum every single day. The automotive...
Atlas Copco Rental Europe has developed and constructed the Power Pack specifically for the offshore renewable energy industry. The Power Pack is tailor-made as an agile power solution for offshore applications like wind farms.
Selecting the wrong electrical cable can have grave results: from unexpected downtime to critical situations. Wondering which cable size you need? Click on the link below to access the calculator and find out which cable is the best to connect your...