Rapid nitrogen intervention helps with the repair of a New Zealand geothermal power station
When a geothermal power plant breaks down, urgent repairs are required to avoid high costs. As the rotor chamber contains highly flammable pentane gas, adding nitrogen speeds up the repair process, limiting downtime of the plant. Atlas Copco Specialty Rental managed to get this geothermal power plant up and running again in 3 days.