A leading manufacturer of life-critical medication faced a significant challenge during a maintenance project. They needed a high volume of onsite nitrogen to ensure uninterrupted production. We stepped in with the NGM 3000.
Due to substantial growth our customer faced some troubles. The existing installation couldn’t keep up with the current demand, and that’s why we provided additional 100% oil-free air and Nitrogen.
During a quarterly maintenance project, our long-time customer required a steady flow of N2 an occasional boost in that flow. To address this, we turn to the NGM 1000 Nitrogen Generator paired with the PBE 1600 VSD+ Booster.
A biochemistry company in northeastern France required a reliable steam solution during a scheduled steam cut. Atlas Copco Rental stepped in with a 6T/H oil-fired steam boiler mounted on a safety trailer, tailored to meet the customer's specific need...
Sobegi, an industrial utilities provider at the Induslacq site in Southwestern France, needed an energy solution during a major planned maintenance shutdown. Atlas Copco Rental swiftly provided an 8T/H plug-and-steam solution to maintain essential op...
Forte Oil Field Services provides a comprehensive range of services to the oil & gas and construction sectors. Their operations at a Kazakh petrochemical plant faced a critical challenge when essential stationary equipment broke down, posing a risk t...
An operator of a popular camping village near Venice, faced an unexpected setback when the local fire department identified a non-conformity with the existing firefighting setup. To safeguard the season's opening date, the customer turned to Atlas Co...