Atlas Copco Rental makes agility count by taking care of your utilities, so you can focus on your business. Wondering how this could be relevant for you? Discover how our experts help production sites all over the world avoiding production losses during turnarounds or maintenance or increasing efficiency by leveraging flexible asset solutions. In addition, our specialized and unique fleet powers several spectacular projects with very demanding and unique scopes. Discover our solutions in action.
Rapid 24/7 support for dairy production with mobile steam boilers. Atlas Copco Rental delivered emergency 8T boilers within 24 hours to minimize downtime and maintain operations.
Emergency steam solution keeps Icelandic homes warm after volcanic disruption
January 12, 2026
When a volcanic eruption in Iceland disrupted a district heating plant, thousands of households were at risk of losing heat during the coldest time of the year. Atlas Copco Specialty Rental stepped in with a rapid, reliable steam solution to protect households during the harshest winter conditions.
Oil-free bubble curtain protects breeding ground giant cuttlefish population
November 25, 2025
When a record-breaking toxic algal bloom threatened to smother up to 80,000 giant cuttlefish eggs along the 20,000 m² rocky shoreline at Cuttlefish Coast, a bubble curtain protected the next generation of giant cuttlefish.
When a leading food and beverage manufacturer faced a sudden boiler outage, Atlas Copco Specialty Rental delivered a fast, energy-efficient Plug-and-Steam solution.
Emergencies don’t wait. When a chemical manufacturer faced an unexpected production threat, they knew who to call. Our local Atlas Copco Rental team responded fast with a 4.6Ti+ Steam Boiler—reliable, powerful, and ready to perform.
When urgent maintenance threatened to halt production, a leading Food & Beverage manufacturer partnered with Atlas Copco Specialty Rental to implement a fully customized, ready-to-deploy air solution.
A chemical plant’s journey from diesel to electric
July 17, 2025
When a critical compressor failed at a major chemical plant, a fast diesel solution got operations back online within hours — but the real breakthrough came afterward. With our support, the team transitioned to electric, cutting energy costs nearly in half and significantly reducing CO₂ emissions — turning a breakdown into a smarter, more sustainable long-term solution.
A leading manufacturer of life-critical medication faced a significant challenge during a maintenance project. They needed a high volume of onsite nitrogen to ensure uninterrupted production. We stepped in with the NGM 3000.
Due to substantial growth our customer faced some troubles. The existing installation couldn’t keep up with the current demand, and that’s why we provided additional 100% oil-free air and Nitrogen.