Securing projects at multiple plants with a standard solution - Atlas Copco Netherlands
Atlas Copco Netherlands - Industriële gereedschappen en oplossingen
Onze oplossingen
Compressoren
Oplossingen
Producten
Compressoren
Industriële gereedschappen en oplossingen
Oplossingen
Power Technique
Oplossingen
Producten
Power Technique
Energieopslagsystemen
Producten en oplossingen
Oplossingen
Boren
Producten en oplossingen
Verhuuraanbod
Producten en oplossingen
Energieopslagsystemen
Producten en oplossingen

Securing projects at multiple plants with a standard solution

International integrator with projects to one of the largest automotive companies in the world.

Download case study

CHALLENGE
CHALLENGE
The integrator had won a project for a new, major transmission assembly plant. While they had a custom error proofing solution for many of the stations, it was not approved by the customer and needed additional engineering development. They did not have the engineering resources available for this customization, thus project delivery timing was in jeopardy.
 
The integrator had won a project for a new, major transmission assembly plant. While they had a custom error proofing solution for many of the stations, it was not approved by the customer and needed additional engineering development. They did not have the engineering resources available for this customization, thus project delivery timing was in jeopardy.
SOLUTION
SOLUTION
The integrator, Atlas Copco and the end user worked together to validate station requirements, including traceability and in-process verification.
 
The integrator, Atlas Copco and the end user worked together to validate station requirements, including traceability and in-process verification.
IMPACT
IMPACT
After successful delivery, similar projects for four additional plants with the same customer followed. Download the case study for more information.
 
After successful delivery, similar projects for four additional plants with the same customer followed. Download the case study for more information.
ADDITIONAL PROJECTS

+4 PLANTS
ADDITIONAL PROJECTS

+4 PLANTS
 