As of March 1st, we will not support this browser anymore. Please use one of the following supported browsers to continue visiting our website
The production of the closure parts (doors, engine hood, trunk, fenders) is a separate process step within the BIW production line. Here we find the hem flange process as one of the most demanding joining processes within the BIW manufacturing.
Learn everything there is to know about this demanding hem flange process, with this new, in-depth pocket guide.
Dispensing solutions Europe Foundries & Metal Fabrication Government & Defense Dispensing solutions Joining Solutions Pocket Guides North America General Industry Original Equipment Manufacturer Aerospace Electronics South America Automotive Africa and Middle East Heavy Equipment & Machinery Asia Energy Shipbuilding Global Australia Industrial Tools & Solutions Rail Industry
Contact us for industrial assembly tools and Atlas Copco IAS product: SCA industrial dispensing systems
Atlas Copco Tools and Assembly Systems LLC
3301 Cross Creek Parkway
Auburn Hills, MI 48326 USA
+1 (248) 373 3000
Technical Support:
866.TOOL.FIX (866.866.5349)
SCA industrial dispensing systems +1 (248) 377 9722
Atlas Copco Henrob
30000 South Hill Rd
New Hudson, MI 48165 USA
+1 (248) 493 3800
Emergency & Technical Support:
+1 800 4HENROB (800 443 6762)
Contact us for Fabrication and Maintenance tools
Atlas Copco Tools and Assembly Systems
4428 Underwood Rd
LaPorte, TX 77571 USA
+1 (281) 448 5900